# NOC outsourcing pilot - blank case log

Prepared by MSP Shortlist, 16 October 2026. Guide: https://mspshortlist.com/guides/noc-outsourcing-pilot/

Adapt these suggested cases to the proposed service. This is a blank working copy, not a completed test or provider assessment. Agree acceptance criteria and blocking failures before running cases. Keep evidence in your approved systems and reference it here.

## Pilot boundary and owners

Candidate and proposed package:
Client / tenant / approved test environment:
Included and excluded work:
Pilot dates, staffed window, timezone and holidays:
Authorized actions and approval owner:
Runbook versions and access owner:
Emergency stop, rollback owner and retained coverage:
Case observer and acceptance reviewer:
Customer-update owner and fallback contact route:
Billable units, pilot charges and usage limits:

## How to use the outcomes

- Pass: the agreed criterion was observed and its evidence is referenced.
- Fail: the agreed criterion was not met. Describe the failure and required correction.
- Not observed: the case ran, but the evidence is insufficient to decide.
- Not run: the case has not been performed.

A permitted escalation can pass when the supplier is not authorized to fix the issue. Do not treat speed as permission to act. Keep the original failure when adding a retest; a later pass does not erase the first attempt. Do not average away a blocking failure or turn unobserved cases into passes.

Use separate clock events: Acknowledgement; Work start; Mitigation; Restore; Resolution. Keep start/stop, clock type, pauses and the source timestamps in the SLA worksheet or the referenced ticket. Acknowledgement does not supply a restoration time.

## N01. Routine permitted fix

Suggested observation: Correct asset, approved action and ticket evidence

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N02. Approval-required change

Suggested observation: No unauthorized execution; approval trail

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N03. Noisy recurring alert

Suggested observation: Agreed suppression duration and retained visibility

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N04. Duplicate signal

Suggested observation: One coherent incident without losing evidence

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N05. Backup failure

Suggested observation: Job repair distinguished from restore verification

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N06. Failed patch

Suggested observation: Stop rule, rollback owner and business update

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N07. Lost credential access

Suggested observation: Detection, escalation and no false resolution

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N08. Wrong tenant mapping

Suggested observation: Access blocked and mapping corrected

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N09. External-vendor fault

Suggested observation: Evidence package and accepted vendor handoff

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## N10. Critical shift-change incident

Suggested observation: Next owner accepts before prior shift exits

Acceptance criterion and blocking condition (agree before the case):
Attempt 1 date, time, timezone and observer:
Attempt 1 outcome: Not run
Observed action, identity, result and evidence references:
Five-clock / pause log reference:
Retained MSP review, correction and escalation effort:
Required correction, owner and due date:
Retest date, outcome, supporting links and reviewer (keep attempt 1 above):
Case decision, reviewer and date:

## Scope acceptance decision

Cases passed / failed / not observed / not run:
Blocking failures and correction / retest references:
Untested channels, assets, applications and exclusions:
Retained workload and billable-unit findings:
Accepted scope and residual risks with owners:
Buyer decision: Expand / Hold / Reject (choose after review)
Acceptance owner, decision date, time and timezone:
Transition start, receiving owner and emergency takeover route:

The decision belongs to your team and covers only the sampled scope and period. Keep this log with the applicable proposal and service schedule.